07/14/13: Signed application and paid deposit & started mortgage application with NVR

07/29/13: Decided to Mortgage shop

08/01/13: Completed wiring appointment selection

08/04/13: Decided to finance with Navy Federal instead of  NVR

08/04/13: Had to resign documents as specified by attorney (using power of attorney for my husband)

08/17/13: Complete Rug Rite Appointment

08/22/13: Pre-construction meeting

09/03/13: Footings poured

09/06/13: Foundation Completed

09/18/13: Lumber delivered framing scheduled to begin next week

09/ 29/13: Framing completed

10/04/13: Pre-drywall meeting

12/06/13: Final walk-through inspection scheduled

12/09/13: Closing Scheduled (December closing at my request)

 

 

 

 

2 comments:

  1. I also selected the double oven option does this effect how the fridge opens?

    ReplyDelete
    Replies
    1. Hi Gabrielle, I ended up getting the French door refrigerator. It doesn't come in contact with my oven (at least not that I've noticed). Besides whenever I open the oven its to put something in or take something out so its never open for long. The problem I do have is the wall next to the refrigerator. I can't open the right side wide. Overall I am very happy with my kitchen.
      Also, I didn't get the title backslash from Ryan and I'm glad I didn't! I was able to get the backslash of my choice installed for around $600 (materials and labor) through lowes. So please keep that in mind when you make your slections.

      Delete